The Long Read · Ins7ghts Daily, Saturday 21 November 2026

I always bought my records physically. I went to the shop, the sleeve was in my own hands, I could put the record on a deck and hear it before I paid for it. The choice was mine and the evidence was in the room. Very few disappointments came out of that, and the ones that did were my own fault.

Yesterday Google and Blue Origin signed an agreement for launch services covering the first heavy-lift launch of Project Suncatcher, Google's plan to run AI systems in orbit. It is a real agreement about a real programme. On 30 October Google had already reported the response from a Suncatcher prototype satellite, so there is hardware, and it talks back.

Then put the other dates next to it.

On 5 November Blue Origin pushed New Glenn's return to 2027 after a blast at its Florida launchpad. That is the heavy-lift end of the business moving away from you, not toward you, and it moved for a reason nobody in the deal controls.

On 15 November a Columbia-led report warned that space data centres could leave more satellites than stars in the night sky. That is the objection arriving before the capacity does, which is how a technical plan turns into a licensing argument.

Three facts, one shape. Between the announcement of compute and a server you can actually run a job on, there is now a launch window, a physical accident at a pad in Florida, and an astronomy lobby. None of those are engineering problems. All of them are schedule.

The best case against me: Suncatcher is research, not a product line. Nobody is being sold orbital inference this year, no enterprise contract depends on it, and treating a launch agreement as a capacity promise is reading a lab experiment as a procurement document. Fair enough, and if the question were only about orbit I would drop it here.

My answer: the reason to care is not orbit. It is that the roadmap your provider walks you through in a renewal conversation is increasingly a list of things contingent on calendars you cannot audit. Terrestrial capacity has the same shape, with planning permission, grid connections and transformer lead times, but you can at least drive to the site and look at the hole in the ground. You cannot drive to orbit and look at the rack.

The rest of this piece is for subscribers.

Ins7ghts Daily is free. One letter a morning from Yves Mulkers on what moved in data and AI, and why it matters to your side of the table.

Already subscribed? Sign in at the top of the page.